
Framing-to-final-nail roof systems for Boone County builders and homeowners
New construction roofing Florence KY built to pass inspection the first time
New construction roofing Florence KY means installing a complete roof system on a brand-new structure, not patching an old one. We handle the decking, synthetic underlayment, ice and water shield, flashing, and ridge vents so your home passes inspection and stays dry through its first Kentucky winter. If you are building in 41042 or anywhere in Boone County, we work directly with your framer and builder.
What's included
What our new construction roofing package covers
Every new build roof we install in Florence includes the full system from deck to ridge. You are not paying for a shingle layer and hoping the rest works out. Here is what is in the scope, and what we quote separately if your build needs it.
Full deck inspection
We walk the sheathing with a moisture meter before anything goes down, checking for soft spots, gaps, and proud nails. On a new build this takes under two hours and catches the framing issues that would otherwise show up as a leak in year two.
Ice and water shield
We install ice and water shield along every eave, valley, and penetration. In Kentucky's freeze-thaw climate, that membrane is what stops ice dams from backing water under the shingles and into your ceiling.
Synthetic underlayment
Synthetic underlayment goes across the entire roof field, not just the valleys. It is lighter and stronger than old roofing felt and gives you a secondary water barrier if wind ever lifts a shingle.
Flashing and ventilation
Step flashing at walls, counter-flashing at chimneys, and drip edge at the rakes are all part of the scope. We balance intake and exhaust with ridge vents so attic heat and moisture escape instead of cooking your shingles from below.
Finish material installation
Asphalt shingles, standing seam metal, or synthetic slate, installed to the manufacturer's written nailing pattern. We register the warranty in your name and hand you the paperwork before we leave the site.
Site cleanup and magnet sweep
We haul off every scrap and run a magnet sweep across the yard, driveway, and flower beds. On a new build with kids and pets moving in, a missed roofing nail is a real problem, so we do not skip this step.
Service overview
What new construction roofing Florence KY actually involves
New construction roofing Florence KY is the installation of a complete roof assembly on a newly framed structure, from roof decking and synthetic underlayment to flashing, ridge vents, and the finished shingle or metal surface. Nothing gets torn off because there is nothing there yet. That changes the job completely: every layer is inspected before the next one covers it, and the whole system has to match the architect's plans, the manufacturer's spec sheet, and Kentucky's residential building code.
Most of our new build work in Florence starts with a builder's schedule, not a leak. A framer finishes trusses in Seven Points or Forest Hills, and we are on site within a few days to dry in the roof before the drywall crew arrives. If you are searching for new construction roofing in Florence KY near me, the timeline matters more than the price. A roof that sits open for two weeks while you wait on a crew is a roof that gets rained on, and wet decking means mold, warped sheathing, and a callback you never wanted.
The service timeline
How a Florence new build roof comes together
The process flexes to the condition, but these checkpoints keep decisions clear.
Plan review
We start with your roof plan, pitch, and material selection. If you have not picked shingles yet, we walk you through asphalt shingles, standing seam metal, or synthetic slate and what each does to your budget and your warranty. This takes about an hour on site or over the phone.
Deck inspection
Before anything goes down, we walk the sheathing with a moisture meter and check for soft spots, gaps, and proud nail heads. On a new build this is quick, usually under two hours, but it catches the framing issues that turn into leaks three winters later.
Underlayment and flashing
We roll synthetic underlayment across the field and install ice and water shield along eaves, valleys, and penetrations. Flashing goes in at chimneys, walls, and vents before the finish layer. This stage runs one to two days on a typical Florence home.
Finish installation
Shingles or metal panels go down in courses, nailed to the manufacturer's pattern with a roofing nail gun. Ridge vents and hip caps finish the job. A standard 2,000 square foot ranch takes our crew one to two days from first course to final cap.
Final walk and cleanup
We magnet-sweep the yard, haul off every scrap, and walk the roof with you or your builder. You get photos of the completed system, the warranty registration, and a written note on what to watch during the first year. Most builds close out the same day.
Tools & methods
Tools and methods we use on every build
Purpose-built equipment, used by trained technicians, so the job is done accurately the first time.
Roofing nail gun
Pneumatic nailing to the manufacturer's pattern. Correct depth and placement is what the inspector checks first, and it is what keeps shingles from blowing off in a 60 mph gust.
Moisture meter
Checks the sheathing for hidden moisture before underlayment goes down. A dry deck is the difference between a 30-year roof and a callback.
Infrared camera
Finds wet insulation and hidden moisture in the attic after dry-in. It shows us what the eye cannot see, so we fix the source instead of guessing.
Chalk line
Snaps straight courses across the roof field so shingle lines stay true from eave to ridge. Crooked courses are the first thing a homeowner notices from the street.
Roofing ladder and safety harness
OSHA-compliant access and fall protection on every pitch. Our crews do not free-climb, and that is a big part of why our safety record is clean.
Tin snips and utility knife
Cuts flashing, drip edge, and shingle detail work cleanly. Sharp, correct cuts are what make a valley or a chimney flashing look finished instead of patched.
Use cases
When Florence customers call us for new construction roofing
These examples show how the service framework adapts rather than forcing every call through one repair.

The Reserve metal roof upgrade
A homeowner building in The Reserve was quoted asphalt shingles by their original roofer but wanted a longer-lasting roof. The framing had not been checked for the added weight of metal panels. → We verified the truss design could carry standing seam metal, then installed the panels with copper trim details. The finished roof carries a 40-year material warranty and matches the modern look the homeowner wanted.
Cox Creek commercial flat roof
A small commercial shell near Cox Creek had a flat roof section that ponded water within hours of the first rain. The original membrane had been laid without a proper drainage slope. → We installed tapered insulation to correct the slope, then laid a Firestone membrane over the full field. Water now moves to the drains instead of sitting in the middle, and the roof passed inspection on the first visit.
Problems we solve
Problems we solve on Florence new construction roofs
A new build should not have roof problems, but they happen when the decking, flashing, or ventilation gets rushed. These are the issues we see most on Florence job sites and how we handle them.
Framer leaves wet or damaged decking
We moisture-test the deck before underlayment goes down. Any soft or saturated panel gets flagged, photographed, and replaced before we proceed. It adds a day to the schedule and saves you a tear-off in five years.
Builder needs dry-in before rain hits
We stage materials the day before framing finishes and mobilize within 3 to 5 business days. If rain is coming, we prioritize the dry-in and finish the detail work after the structure is protected.
Poor attic ventilation cooks the roof
We calculate ventilation to the 1:150 ratio and install ridge vents matched to the right number of intake vents. It is a small line item that adds years to the shingle life.
Flashing details fail at walls and chimneys
We install step flashing woven into the shingle courses and counter-flashing set into the masonry, not caulked over it. Every penetration gets checked before the finish layer covers it.
Questions before we arrive
Frequently asked questions about new construction roofing in Florence

How much does new construction roofing cost in Florence KY?
Most new construction roofs in Florence run $6.50 to $12.00 per square foot installed in 2026, which puts a typical 2,000 square foot ranch between $13,000 and $24,000 depending on pitch and material. Asphalt shingles sit at the low end, standing seam metal at the high end. Decking, flashing, and ventilation are included in that range. Steeper roofs, complex hips, and tile or slate push the number up.
What is the best roofing for new construction in Florence Kentucky?
Architectural asphalt shingles are the best value for most Florence new builds, and Owens Corning Duration and GAF Timberline are the two systems we install most. They handle Kentucky's freeze-thaw cycles, carry 25 to 50 year material warranties, and cost far less than metal. If you plan to stay 30 years or want a modern look, standing seam metal is worth the premium. Clay or concrete tile suits specific architectural styles but adds significant weight and framing cost.
How long does new construction roofing take in Florence KY?
A standard single-family home in Florence takes 2 to 4 days of actual roofing work once the frame is ready. Underlayment and flashing eat one to two days, and the finish layer takes one to two more. The bigger variable is scheduling: we typically dry in a new build within 3 to 5 business days of framing completion, and the full roof is finished before drywall goes up.
Do you offer new construction roofing in Florence KY?
Yes. We install new construction roofing across Florence and the rest of Boone County, including 41042 and 41022. We work with builders, general contractors, and homeowners acting as their own GC. If you have a roof plan and a framing date, call (844) 799-4703 and we will walk the site, price the system, and lock in your dry-in window.
Ready when you are
Get your New construction roofing Florence KY quote today
Send us your roof plan and framing date, and we will price the system, confirm the dry-in window, and put it in writing. Licensed, insured, and warrantied work from a Boone County crew that has been on Florence roofs since 2022. One call and your build stays on schedule.

Talk with the local team
Request new construction roofing
Call (844) 799-4703 any time, day or night, and a real person picks up. For standard inspections and estimates we schedule within 24 to 48 hours, and emergency leak calls get same-day priority. You can also email info@revixionlab.com with photos of the problem and we will get back to you with next steps.


